prEN 18213-2
District heating and district cooling pipes - Bonded single and twin pipe systems for directly buried hot and cold water networks - Part 2: Qualification testing of PE-Welder
Draft Public enquiryProject stage codes
1. Decision on WI Proposal
2. Projektas
3. Viešoji apklausa
From 2025-10-17
till 2025-12-16
4. Closure of enquiry
5. Submission to Formal Vote
Organisation
CEN Europos standartizacijos komitetasICS
23.040.07 - Pipelines and its parts for district heatTechnical Committee
TK 50 Heating and Ventilation SystemsForeignTC'S
CEN/TC 107Number of comments
0Comment start date
2025-10-17Scope
This document specifies the methods of examining the knowledge and skill set of the PE-welder required to carry out on-site joint casing connections on thermally insulated single and twin pipe systems for directly buried hot and cold water networks according to and .The application of these specified methods specifications ensures that the examination is carried out according to a standardised examining procedure. This document applies to the following processes: - preparatory works for joint casing assembly; - assembling and testing the elements for surveillance systems; For special surveillance systems it can be important to have additional training.preparatory works for joint casing system installation; - assembling weldable joint casing system;executing hot gas welding and hot gas extrusion weldingverifying joint tightness (leakage testing); - thermally insulating the joint casing (PUR foaming or half-shell); - sealing fill & vent openings (weldable plugs); - assessing overall installation quality of the completed joint connection (non-destructive).