prEN 124-700
Gully tops and manhole tops for vehicular and pedestrian areas - Part 700: Factory production control, thirdparty monitoring and certification for gully tops and manhole tops made of polyamide
Draft Public enquiryProject stage codes
1. Decision on WI Proposal
2. Projektas
3. Viešoji apklausa
From 2025-02-07
till 2025-04-13
4. Closure of enquiry
5. Submission to Formal Vote
Organisation
CEN Europos standartizacijos komitetasICS
93.080.30 - Road equipment and installationsTechnical Committee
TK 29 Water supplyForeignTC'S
CEN/TC 165Number of comments
0Comment start date
2025-02-07Scope
This document describes procedures for factory production control, third party inspection, and certification for verifying the conformity of gully tops and manhole tops with a clear opening up to and including 1 000 mm for installation within areas subjected to pedestrian and/or vehicular traffic in accordance with prEN 124-7. This document is only applicable in combination with prEN 124-7. The quality management system is expected to conform to or to be no less stringent than the relevant requirements of EN ISO 9001. This document details the applicable characteristics to be assessed for type testing, batch release test, process verification test and audit test, as well as frequency and sampling for testing products according to prEN 124-7.