GDPR

projektai-lsd Lithuanian Standards Board
Portal for draft standards
Comment end date 2020-05-16

Project stage codes

1. Nauja darbo tema
2. Viešoji apklausa
From 2020-03-18 till 2020-05-16
3. Closure of enquiry
4. Projekto priėmimas
5. Išleidimas (Paskelbimas Biuletenyje)

Organisation

CENELEC Europos elektrotechnikos standartizacijos komitetas

ICS

33.040.20 - Transmission systems

Technical Committee

TK 1 Electronics

ForeignTC'S

CLC/TC 46X

Number of comments

0

Comment start date

2020-03-18

Scope

This part of IEC 62037 defines the impact test on coaxial connectors to evaluate their robustness against weak connections and particles inside the connector, as independently as possible from the effects of cable PIM (passive intermodulation). For other connectors (e.g. panel mounted connectors), the cable can be replaced by an adequate transmission-line (e.g. airline, stripline). In order to evaluate the effects of mechanical stresses on the connectors, a series of impacts is applied to the connectors while measuring the PIM.

Relations

Pakeis
LST EN 62037-3:2012