GPDR
Privatumo politika
projektai-lsd Lietuvos akreditacijos ir standartizacijos agentūra
Standartų projektų portalas

Projekto etapai

1. Viešoji apklausa
Nuo 2026-05-02 iki 2026-07-01

Organizacija

CENELEC Europos elektrotechnikos standartizacijos komitetas

ICS

33.100.20 - Atsparumas trukdžiams

Užsienio technikos komitetas

CLC/TC 65X

Komentarų skaičius

0

Komentavimo pradžia

2026-05-02

Taikymo sritis

In addition to the requirements of IEC 61326-1, this part of IEC 61326 specifies the EMC test requirements for process automation equipment using at least one Ethernet-APL (Ethernet ADVANCED PHYSICAL LAYER) compliant port according IEC TS 63444. The type of equipment covered by this document includes INFRASTRUCTURE DEVICES such as switches as well as measurement and control devices. This document provides requirements for the EMC test setups of the APL interface for devices intended for use in process control and process measurement. The other functions of the equipment remain covered by other parts of the IEC 61326 series. NOTE Ethernet-APL uses IEEE Std. 802.3-2022 Ethernet Physical Layer 10BASE-T1L, suitable to be used for full- duplex communication over a single balanced pair of conductors. The test levels are based on the intended environment as stated in the product’s specification or user documentation and selected appropriately from IEC 61326-1.